Our Story
First steam turbine with capacity of 750kW had been successfully produced and operated.
2006
Hangzhou Steam Turbine Factory and Siemens signed a contract on "Industrial Steam Turbine License and Technical Secret", which opened the prelude to the introduction of Siemens Three Series Industrial Steam Turbine Technology. After that, total 3 cooperation contracts had been signed every 10 years.
Hangzhou Steam Turbine Power (Group) Ltd., was established.
Company’s stock officially listed on Shenzhen stock exchange. Stock code "200771".
1998.4 Company’s share listing
Company introduced "6S" management model from foreign company to carry out Large-scale renovation of production site and plant area.
A ceremony has been hold to celebrate the successfully operation of the 50th unit cooperated between HTC and HITACHI.
2014.6 The 50 unit ceremony between HTC and HITACHI
HTC has established the leading position of enterprises in the field of research and development and manufacture of industrial steam turbines with variable speed and variable operating conditions in China. Also, HTC has established itself in the advanced product in global market.
After digestion and assimilation, first multi-stage industrial steam turbine with introduced technology has been successfully operated.
1980 First Three Series industrial steam turbine